
ChingLuh Shoes Factory
Introduction
The existing factory had an internal overheating problem and the owner wanted to renovate it to improve thermal occupant comfort. ISD conducted a site survey, measured the current temperature and air velocity at various points then conduct CFD simulation for the current situation. The CFD simulation have to demonstrate a correlation with the measurement and be used to evaluate the effectiveness of proposed solutions.
Owner: Ching Luh Group
Type of project: Shoe Factory
GFA: 4,800 sqm
Services: Natural Ventilation and CFD Analysis